Request for Quotation: KIAT PBG PROJECT IMPLEMENTATION PROCUREMENT OF METERS, PRESSURE SENSORS AND DATA SUPPORT EQUIPMENT
Request for Quotation
KIAT PBG Project Implementation
Activity: W-1-01-03
PROCUREMENT OF METERS, PRESSURE SENSORS AND DATA SUPPORT EQUIPMENT
Date of issue: September 29, 2020
The Kemitraan Indonesia Australia untuk Infrastruktur (hereby referred to as KIAT) is a 10-year facility supported by the Australian Government and implemented by Cardno. KIAT has collaborated with the Directorate General for Human Settlements (DGHS) and the World Bank to design the PBG Activity, which is a next generation design of the ongoing output based grant for water supply (the Water Hibah). Pursuant to a bidding process, Cowater International in association with PT Infratama Yakti have been selected to provide the Project Implementation Consultant (PIC) services as required by the Activity design.
This Request for Quotation (RFQ) is to support Cowaterto contract a firm tosupply, deliverand assist with the installation and commissioning of water meters, pressure sensors, data loggers and associated equipmentincluding:
- 24 electromagnetic water flow meters of 150 to 600 mm. dia.
- 60pressure sensor devices
- Associated data recording and transmission equipment
- 2 transportable electromagnetic flow meters
- Miscellaneous survey equipment
The complete works of supply, delivery and assistance with installation are expected to be completed within a period of three months from contract award.
This RFQ was issued on 29 September 2020and consists of:
- RFQ document
- Attachment A –Technical Specifications
- Attachment B – Subcontractor Template
- Attachment C – RFQ Response Template
- Attachment D –Pricing Template
Full documentation related to this Request for Quotation is available on request at:[email protected]
Suppliers will be given22(twenty two) working days to respond to this request for quotation. The closing date and time forquotations is 4pm Jakarta standard time on Wednesday28October 2020.
Quotations regarding this RFQ (including commentson the Subcontractor Template) should be submitted by email to:[email protected]
Partial bids for the works will not be considered.
Question related to this procurement should be submitted to: [email protected], please write Procurement on email subject.Questions will be acceptedup to and including Tuesday13 October 2020. Questions submitted after this time will not be accepted.Any questions submitted by the specified cut-off date will be answered, with the question and answer circulated to all suppliers.